View from top of West Building looking to the north to what was the link |
And it continues. The construction is moving from the demolition stages to the let's get ready to pour concrete stages. The Open area with ceiling and a couple walls used to be room 100 and is the location for the new kitchen.
The dirt is the area between the two buildings and in a couple months will be the commons and the second and third floor of the new building.
The entire project will be completed in the all of 2016.