These are views of the area on 47th street between the two buildings. It once was the location of the Link and bicycle ranks and landscaping. In their places are cranes and bulldozers and heavy equipment.
The new building should start to rise this summer. Some parts will be available for classes this fall. The commons, kitchen and cafeteria should be ready around end of February 2016 and the entire project completed fall of 2016.
No comments:
Post a Comment